Cutaway diagram showing 28mm Pilkington Activ self-cleaning double-glazed sealed unit — pyrolytic titanium-dioxide outer pane with photocatalytic dirt breakdown plus Planitherm Low-E inner
Cutaway diagram showing 28mm Pilkington Activ self-cleaning double-glazed sealed unit — pyrolytic titanium-dioxide outer pane with photocatalytic dirt breakdown plus Planitherm Low-E inner

Pilkington Activ Self-Cleaning Double Glazed Unit

From £45
  • BS EN 1279
  • FENSA registered
  • 10-year warranty
  • Made in Bristol, UK
Made to your exact specification

Enter your exact dimensions, glass type, gas fill, and accessories in our configurator for instant trade pricing.

Configure & Get Price
Description

Self-cleaning by the chemistry of UV + rain. A 28mm double-glazed sealed unit with a Pilkington Activ self-cleaning outer pane and a Planitherm Total+ Low-E inner pane, argon-filled, delivering A-rated thermal performance while dramatically reducing the frequency of external glass cleaning. Pilkington Activ is the original self-cleaning glass — launched in 2002, now the dominant UK self-cleaning specification on residential and commercial new-build.

The self-cleaning mechanism is two-stage: photocatalytic + hydrophilic. The outer pane carries a microscopically thin titanium-dioxide (TiO₂) coating that, when exposed to UV from daylight, breaks down organic dirt (bird droppings, leaf residue, atmospheric grease, algae spores) via a photocatalytic redox reaction. When it rains, the TiO₂ surface becomes hydrophilic — water spreads as a sheeting film rather than beading into droplets — and the loosened dirt is rinsed away with the sheeting flow, leaving a streak-free finish without mineral spots.

Technical specification

Overall thickness 28mm
Build-up 4mm Pilkington Activ outer (TiO₂ coating face 1) / 20mm argon cavity / 4mm clear with Planitherm Total+ soft-coat (face 3)
Outer coating Pilkington Activ — pyrolytic titanium dioxide, applied on float-line during glass manufacture (permanent, cannot wear off)
Gas fill 90% argon (BS EN 1279-3)
Spacer bar Warm-edge composite, black
U-value (centre-pane) 1.1 W/m²K
g-value 0.61
Light transmittance ~77%
BFRC Window Energy Rating A (in compliant frame)
Self-cleaning activation UV-A daylight (works even on overcast UK winter days; faster cycle on bright south-facing aspects)
Standards BS EN 1279, BS EN 673, BS EN 410, Pilkington Activ datasheet (Pilkington publication 8005)

Where this unit is the right call

  • Hard-to-clean window locations — first-floor and upper-storey externals, dormer windows, conservatory roof panels, gable-end and apex glazing, atrium glazing, and any window where access for cleaning is awkward or costly.
  • Bird-droppings prone aspects — windows beneath tree canopies, near garden features that attract birds, coastal aspects with gull activity. The photocatalytic effect breaks down the organic guano faster than it can stain.
  • Pollen and tree-sap exposed locations — sycamore, lime, and oak tree drip-zone glazing where standard glass becomes spotted within weeks.
  • Commercial and rental property where cleaning costs are recurring — letting agents and facilities managers find the maintenance cost reduction justifies the spec uplift within 3-5 years.
  • A-rated WER + self-cleaning in one spec — Building Regs L compliance plus low maintenance, the standard residential new-build self-cleaning brief.

For coastal aspects where salt film is the dominant cleaning issue, the Saint-Gobain Bioclean Self-Cleaning Coastal Unit has better salt-rinse performance in field testing. For the dedicated self-cleaning topical context, see the self-cleaning glass topical page. For standard non-coated A-rated, the 28mm Low-E A-Rated Double Glazed Unit is the cheaper alternative.

Stock sizes and pricing

Five UK-standard stock sizes below. Dispatch 7-10 working days from order. The Pilkington Activ outer pane adds £35/m² flat over the equivalent uncoated Low-E build — the configurator routes custom sizes via the same per-m² rate. Trade accounts: tiered volume pricing on log-in.

Certification and standards

UKCA mark, BS EN 1279 Declaration of Performance, Pilkington Activ outer-pane authentication certificate (sealed unit identifies coated pane orientation), argon-fill certificate, Planitherm low-E coating identification, and a Letter of Conformance referencing the Pilkington Activ technical datasheet for the self-cleaning performance claim. For commercial spec-sheets, we supply the full Pilkington Activ life-cycle assessment on request.

Frequently asked questions

Does it actually clean itself, or do I still need to wash it?

It cleans itself of organic dirt (bird droppings, leaf residue, pollen, atmospheric grease, algae spores) and rinses to streak-free with rainfall. It does not remove paint splatter, builder's-grade silicone smears, or mineral spots from hard-water borehole spray — those need manual cleaning. The realistic claim: 80-90% reduction in cleaning frequency, not 100% elimination.

Does it work in shade or in winter?

The photocatalytic reaction needs UV-A, which is present even on overcast UK winter days at 5-15% of summer levels. North-facing windows in deep shade still receive enough UV to maintain the cycle, just slower (a north-facing dirt cycle that resets in a week south-facing might take 2-3 weeks north-facing). For sustained efficacy, daylight (not direct sunlight) is sufficient.

Will the coating wear off over time?

No. Pilkington Activ is a pyrolytic coating, applied at the float-glass production stage at ~600°C — the titanium dioxide is fused into the glass surface molecular structure. It cannot be wiped off, scratched off, or weathered off. The performance claim is for the lifetime of the glass.

Can I use cleaning products on it?

Yes, but you usually don't need to. If you do wash externally, use clear water with a soft sponge — no detergent, no vinegar, no abrasive cloth. Glass-cleaning fluids deposit residues that interrupt the photocatalytic cycle until the next rain. Avoid silicone-based glass treatments (Rain-X and similar) — they coat over the Activ layer and block the photocatalytic mechanism.

How does it compare to Saint-Gobain Bioclean?

Activ and Bioclean are both pyrolytic TiO₂ self-cleaning coatings with very similar performance specs. Activ is the original (Pilkington, launched 2002) and dominates the UK residential market. Bioclean (Saint-Gobain, launched 2003) has marginally better field-test performance in coastal salt-film conditions. For inland aspects, either works; for coastal, prefer Bioclean. See the Bioclean Coastal flagship.

Lead time and warranty?

7-10 working days dispatch. 10-year warranty on edge-seal integrity, argon retention, and Low-E inner-pane performance. The Pilkington Activ outer coating is covered by Pilkington's own 10-year performance warranty (passed through to end-user via our supply chain).

Does it work on conservatory roofs?

Yes — and arguably this is where self-cleaning glass earns its keep most. Conservatory roof panels are nearly impossible to clean from below and dangerous to clean from above. Activ keeps the panels clear of organic deposits without ladder access. For conservatory-specific specifications, the configurator includes a "conservatory roof glazing" option that lifts the toughened-outer requirement (BS EN 12150) automatically.

Material

Glass Composition

Each sealed unit is constructed from float glass manufactured to BS EN 572 standards. Available in clear, low-iron, or tinted variants depending on your specification requirements.

Spacer Bars

We use warm-edge spacer bars as standard, which significantly reduce thermal bridging at the glass edge. Options include stainless steel, aluminium, or composite spacers in black, grey, or silver finishes.

Gas Fill

Standard units come with dry air fill. Argon gas fill is available as an upgrade, improving thermal performance by approximately 0.3 W/m²K. Krypton gas is available for maximum performance in slim-profile units.

Sealants

All units feature a dual-seal system: primary seal of polyisobutylene (PIB) for gas retention, and secondary seal of polysulphide or silicone for structural integrity. This dual-seal construction provides a minimum 20-year service life under normal conditions.

Care

First Six Months: Monthly Checks

Watching for Condensation

Condensation between panes indicates seal failure requiring complete unit replacement. Temporary external condensation is normal when outdoor temperature drops below dew point (typically below 5°C).

External condensation evaporates within 2-3 hours after sunrise. This is actually a good sign showing your glazing insulates effectively.

Testing Hardware Function

Window hardware should operate through 30 complete open/close cycles without resistance. Friction hinges maintain 90° opening position without sagging.

Increased resistance indicates debris accumulation in track channels. This requires cleaning to prevent hardware damage.

Every Three Months

Inspecting Seals

Perimeter seals should show no gaps, tears, or separation from the frame. Seal degradation appears as grey discolouration or hardening texture.

Replace seals at the first sign of deterioration. This prevents water ingress and maintains thermal performance.

Verifying Drainage

Weep hole covers should lift easily. Channels should drain within 30 seconds when you pour 50ml water into the frame cavity.

Blocked drainage requires clearing with a 5mm diameter nylon brush or compressed air at 30-40 PSI. Never use sharp metal objects that might damage drainage channels.

Lubricating Hardware

Friction stays, hinges, and locking mechanisms need lubrication. Apply 3-4 drops of 3-in-One oil per hinge point, or use PTFE-based dry lubricant.

Avoid WD-40 and petroleum-based lubricants. These attract dust and create gummy residue that degrades hardware function over time.

Twice a Year: Deep Clean

Cleaning Frames Properly

Wash frames with pH-neutral detergent (pH 6-8) diluted at 1:20 ratio with warm water (15-25°C). Use a soft cloth or sponge.

Never use abrasive cleaners containing pumice, silica, or alkaline compounds above pH 10. These etch uPVC surfaces and remove protective UV stabilisers that prevent yellowing.

Cleaning Glass Surfaces

Use microfibre cloths (300-400 GSM density) with 1:10 white vinegar solution. This removes mineral deposits without scratching Low-E coatings.

Overlap squeegee strokes by 20mm to prevent streaking. Avoid paper towels - their wood fibre content scratches soft Low-E coatings.

Conditioning Gaskets

EPDM and neoprene gaskets need silicone spray lubricant (silicone concentration 30-40%) to maintain flexibility. This simple step extends gasket life significantly.

Untreated gaskets harden within 5-7 years. Hardened gaskets lose compression properties and allow air infiltration that increases heating costs.

Annual Professional Check

Testing Thermal Performance

Thermal imaging identifies areas exceeding target U-value by more than 0.2 W/m²K. Double glazing should maintain 1.2-1.4 W/m²K. Triple glazing should maintain 0.8-1.0 W/m²K.

These values apply when glazing is properly installed and maintained according to manufacturer specifications.

Checking Seal Integrity

Inert gas concentration testing measures argon retention in sealed units. Argon concentration below 85% of original fill (starting at 90-95% fill) indicates seal breach.

This requires unit replacement within 12 months to prevent complete seal failure and internal condensation.

Adjusting Hardware

Euro-cylinder locks adjust at three points: height, width, and compression. Use a 4mm Allen key for adjustments.

Properly adjusted locks engage at 5-8mm penetration depth without forcing. Misadjustment causes lock mechanism failure within 3-4 years of installation.

Installation

Preparing for Installation

Understanding Frame Capacity

Your existing frames need proper assessment before new glazing installation. Triple glazing units weigh 28-32 kg/m², whilst double glazing weighs 18-20 kg/m². This weight difference matters significantly.

Timber frames older than 25 years require reinforcement. Steel or aluminium angle brackets install at 300mm intervals to support the additional weight. uPVC frames manufactured before 2002 lack internal reinforcement chambers and need complete replacement rather than retrofit.

Getting the Frame Square

Frame squareness directly affects glazing performance. Diagonal measurements must match within ±2mm for openings under 1200mm width. Larger openings allow ±3mm tolerance.

Out-of-square frames cause uneven seal compression. This irregularity reduces the expected 20-year lifespan down to just 8-12 years.

Setting Up Drainage

Proper drainage prevents water damage. Weep holes position at 600mm intervals along the bottom frame rail. Each hole measures 8mm diameter and angles 15° outward.

Blocked drainage allows water accumulation exceeding 200ml capacity. This leads to seal degradation within 18 months of installation.

Installation Process

Installing Glazing Beads Correctly

External glazing beads follow a specific sequence: bottom first, then sides, finally top. Internal beads reverse this order: top first, then sides, then bottom.

This sequence prevents glass unit sagging during installation. It maintains the critical 3mm minimum edge clearance around the entire perimeter.

Positioning Setting Blocks

Distance pieces position at quarter points along the bottom edge. Units under 1200mm width need two blocks. Units between 1200-2400mm require three blocks.

Setting blocks measure 25mm wide × 5mm thick. They use neoprene or EPDM rubber with Shore A hardness between 60-70.

Applying Sealants Properly

Low-modulus neutral-cure silicone applies at 6-8mm bead width with continuous coverage. Two-part polysulphide sealants cure at 3mm depth per 24 hours at 20°C ambient temperature.

Full cure takes 7-10 days. Avoid exposure to cleaning agents during this period.

Maintaining Edge Clearances

Glass edges maintain 3mm minimum clearance from frame on all sides. Inadequate clearance causes thermal stress cracking.

This cracking occurs when temperature differentials exceed 30°C between glass edges and centre pane.

Preventing Heat Loss

Insulating Frame Cavities

Frame cavities fill with polyurethane foam (0.024-0.028 W/mK thermal conductivity) or PIR board cut to exact dimensions. Gaps exceeding 2mm reduce frame U-value performance by 0.15-0.22 W/m²K.

Creating Expansion Gaps

Perimeter expansion gaps maintain 10-12mm width around the frame exterior. These fill with closed-cell polyethylene foam backer rod before external sealant application.

Temperature fluctuations cause uPVC frame expansion and contraction. Frames move 0.6mm per metre for every 10°C temperature change.

Warranty

Required Documentation

Maintain installation certificates, warranty documents, and maintenance logs in a safe place. Warranty claims require evidence of annual maintenance.

This maintenance must be performed by qualified installers or documented DIY maintenance following manufacturer specifications exactly.

Actions That Void Warranties

Warranty exclusions include several specific actions. Never drill frame members or apply paint and coatings to uPVC surfaces.

Don't install aftermarket restrictors without manufacturer approval. Avoid abrasive cleaners and never attempt to modify sealed units yourself.

Inspection Requirements

Manufacturers require access for inspection within 10 working days of warranty claim submission. Failed units must remain in place until inspection occurs.

Retain failed units until replacement authorisation is provided. This typically takes 14-21 days from the inspection date.

Shipping & Returns
  • Free UK mainland shipping on orders over £300
  • Made to order — lead time confirmed at order confirmation
  • Non-mainland UK (Northern Ireland, Channel Islands, Isle of Man, Highlands & Islands): email orders@panerelief.co.uk for a delivery quote
  • Returns: made-to-measure glass is manufactured to your exact specification and cannot be returned for change of mind (UK Consumer Contracts Regulations 2013 exemption for personalised goods). Units faulty on arrival are replaced free of charge — report within 48 hours of delivery.

Need a Custom Size?

Use our glass configurator to specify exact dimensions, gas fills, coatings, and more — with instant trade pricing.

Configure Your Unit

Frequently Asked Questions

Everything you need to know about this product before ordering.

  • Our insulated glass units achieve U-values as low as 1.0 W/m²K with argon gas fill and low-emissivity coatings. The exact U-value depends on your chosen glass specification, spacer bar type, and gas fill. We can provide a detailed thermal calculation for your specific configuration on request.

  • Yes, we manufacture bespoke units to your exact specifications. Simply provide the width, height, and glass configuration you need. There is no minimum order quantity for custom sizes, and we can accommodate most non-standard shapes including arched, circular, and raked units.

  • Standard units ship within 2–3 weeks from order confirmation. Custom specifications such as toughened, laminated, or triple-glazed units may take 3–4 weeks depending on glass availability. We will confirm the exact lead time when we process your order.

  • We supply direct to trade — our units are designed for professional installation by qualified glaziers and window fitters. Each unit ships with fitting instructions and gasket recommendations. If you need installation support, we can recommend approved installers in your area.

Sealed Unit Replacement

How to Replace a Sealed Unit

Follow these steps for a professional sealed unit replacement. Always wear protective gloves and eyewear when handling glass.

1

Measure the Opening

Measure the width and height of the glass (not the frame) in at least three places. Take the smallest measurement and deduct 2mm for clearance. This gives you your order size.

2

Remove the Beading

Starting with the longest bead, insert a stiff putty knife or glazing chisel into the gap between bead and frame. Gently lever outward. For uPVC, the bead will unclip. For timber, carefully prise the pinned bead away.

Number each bead as you remove it so they go back in the correct position.
3

Remove the Old Unit

Using suction cups, carefully lift the failed sealed unit out of the frame. Tilt the top edge toward you first, then lift clear. Have a second person assist with larger units.

Always wear cut-resistant gloves and safety glasses when handling glass.
4

Clean the Frame Rebate

Remove any old sealant, dirt, or glazing tape from the rebate using a scraper and white spirit. The rebate must be clean and dry for the new unit to sit properly and for sealant to adhere.

5

Position the Packers

Place setting blocks at the quarter and three-quarter points along the bottom of the frame. These support the weight of the glass and ensure even distribution. Use 5mm packers for standard units.

6

Insert the New Sealed Unit

Lower the new unit into the frame, resting it on the packers. Push the unit back into the rebate until it sits square. Check that the gap is even all around — adjust packers if needed.

7

Refit the Beading

Starting with the shortest bead, press each one firmly back into position. For uPVC, tap with a rubber mallet until it clicks home. For timber, pin back in place. Ensure all beads are flush with the frame.

8

Check & Finish

Use a spirit level to confirm the unit is sitting level. Check all four edges for even gaps. Clean the glass with a soft cloth. The new unit should operate smoothly within the window.

Tools & Materials Needed
Tape measureGlazing chisel or stiff putty knifeSuction cupsSetting blocks / packersLow-modulus silicone sealantSealant gunCloth and white spiritSafety glovesSafety glasses

Not confident doing this yourself? We offer professional installation across Bristol and the South West.

Need Help? Contact Us

Trade Support

How We Help Trade Customers

Bulk Trade Pricing

Volume discounts on all insulated glass units. The more you order, the more you save.

View trade pricing

Technical Support

Our glazing experts are on hand to help with specifications, Building Regs compliance, and installation advice.

Call 0117 330 3057

Reliable Delivery

Nationwide delivery direct to site. Careful packaging ensures your units arrive in perfect condition.

Delivery information

Ready to order?

Get Your Trade Quote Today

Fast specification-led pricing for insulated glass units. No middlemen, direct to your site.